QAWork and Time
Work and Time: Efficient Methods
Basic Concept
- Work = Rate × Time
- If A completes work in n days, A's one day work = 1/n
Combined Work
- If A does work in a days and B in b days:
- Combined rate = 1/a + 1/b
- Time together = ab/(a+b)
Work and Wages
- Wages ratio = Work ratio = Efficiency ratio
- If A and B work for different times: Wages ratio = (Efficiency × Time) ratio
Pipes and Cisterns
- Inlet pipe: Positive work
- Outlet pipe: Negative work
- Net rate = Sum of all rates
Men-Days Formula
- M₁D₁W₂ = M₂D₂W₁
- (Men × Days × Hours/day) / Work = Constant
CAT Strategy
- Use LCM of days as total work for easier calculations
- Convert all rates to same time unit
- For complex problems, use efficiency ratios